31 May Concrete Tank Extension, SWW
We were asked to extend an existing concrete tank and redirect the mechanical pipework,
So we started by digging out the area, concreting a base, installing temporary formwork, concreting the wall, and then installing new mechanical pipework. This tank was extended to help South West Water, gain access to the pipe to test the flow meter.
Concrete – Formwork – Groundworks – Retaining Wall